bellman b1d8a66515 Gate CC2 completion on PR and issue resolution
The Ultragoal now has an explicit repository-operations gate so final completion cannot rely only on roadmap implementation while correct PRs or resolvable issues remain unhandled.

Constraint: The user explicitly added that all PRs should be merged and all issues resolved when they are correct and resolvable.

Rejected: Treating the existing roadmap board as sufficient | it did not require per-PR and per-issue final triage evidence.

Confidence: high

Scope-risk: narrow

Directive: Refresh GitHub PR and issue snapshots at the final gate; do not merge unsafe or incorrect PRs merely to reduce counts.

Tested: gh auth status; gh pr list --state open --limit 200 captured 50 records; gh issue list --state open --limit 1000 captured 1000 records.

Not-tested: Full PR/issue triage is deferred to the dedicated gate and later streams.

Co-authored-by: OmX <omx@oh-my-codex.dev>
2026-05-14 17:21:21 +09:00

43 lines
2.3 KiB
Markdown

# Claw Code 2.0 PR and Issue Resolution Gate
This gate was added to the Claw Code 2.0 Ultragoal after the explicit requirement:
> all PRs should be merged and all issues should be resolved if resolvable and correct.
## Scope
Before the Claw Code 2.0 Ultragoal can be marked complete:
1. Every open GitHub PR at the current final-gate snapshot must be triaged.
2. PRs that are correct, compatible with Claw Code 2.0 direction, and pass required verification must be merged.
3. PRs that are stale, incorrect, duplicative, unsafe, spam, or outside Claw Code scope must not be merged; each needs a recorded rationale.
4. Every open GitHub issue at the current final-gate snapshot must be triaged.
5. Issues that are resolvable and correct must be fixed or explicitly linked to a merged fix.
6. Issues that are spam, duplicates, incorrect, unactionable, externally blocked, or not Claw Code work must be closed or labeled/commented with rationale when repository policy allows.
7. The final completion audit must use a fresh GitHub snapshot, not only the planning snapshot.
## Current live snapshot
A live snapshot was captured locally during G002 execution:
- PR snapshot: `.omx/research/github-live/open-prs.json`
- Issue snapshot: `.omx/research/github-live/open-issues.json`
- Captured on: 2026-05-14 during the active Ultragoal run.
- Observed counts: 50 open PR records and 1000 open issue records from GitHub CLI list calls.
These local `.omx/research/github-live/*` files are evidence inputs, not final proof. The final gate must refresh them and compare deltas.
## Required final evidence
The final report must include:
- Fresh `gh pr list --state open` and `gh issue list --state open` snapshots.
- A PR ledger with one row per PR: merge / reject / defer, reason, verification, commit/merge reference.
- An issue ledger with one row per issue: fixed / duplicate / spam / invalid / deferred-with-rationale / externally-blocked, reason, and linked evidence.
- Verification that no correct, mergeable PR remains unmerged without rationale.
- Verification that no resolvable, correct issue remains open without a fix or rationale.
## Non-goals
This gate does not require merging unsafe, unverified, incompatible, spam, or incorrect contributions. It requires explicit evidence-backed triage and action for everything that is correct and resolvable.